Mezzanine
floors

For storage or for workspace.

Don’t look out, look up. Make the most of your available headroom by potentially doubling your floorspace. Mezzanine floors can provide a less-disruptive and affordable option to moving premises.

// Why Mezzanine Floors

Double your floorspace.

Outcome .01

Than you can shake a stick at.

The uses for a mezzanine floor are almost endless. They can accommodate staff, stock or machinery and are extremely adaptable. A well designed mezzanine floor can suit any purpose you require as your business evolves.

Outcome .02

Built for you.

As independent structures that aren’t tied into the fabric of your building, mezzanines are freestanding and extremely flexible. This means we can completely design them around your existing floor plan.

Outcome .03

The smart option.

The expenses associated with moving your business to a larger space can be phenomenal, but with a mezzanine floor, you can almost double your existing space for a fraction of the cost. It’s the smart, cost-saving alternative.

// frequently asked questions

You weren’t the first person to think it.

How much does a mezzanine floor cost?

This completely depends on the size of the floor and since our mezzanine floors are bespoke it’s really difficult to state figures without understanding the brief first. We will always aim to be as cost-effective as possible.

Do I need planning permission?

Generally no, since most mezzanine floors are not actually connected to the existing structure. However, it is required if the floor is for retail usage over 200 m2

What factors change the cost of the project?

There are a few factors that will increase the cost. The number of staircases, fire protection level, any electrical works, the strength of the underlying surface, the square foot and so on.

Will I need to manage the project?

No need to worry about this, our project manager will cover this on your behalf. However, you’re welcome to be involved as much or as little as you’d like.

How long does it take to install a mezzanine?

It really depends on the size of the project, but generally, they take between 3 to 6 weeks. We will always try to be as efficient as possible, keeping the time and disruption involved with installation to a minimum.

Recent Projects

Mezzanine Floors→

Free Quote & 3D office design

or call 07932 001 775

// More Services

More than mezzanine floors.

Interior
fit out

$ LEARN MORE

Interior
refurbishment

$ LEARN MORE

Solid & glass
partitions

$ LEARN MORE

Supporting
areas

$ LEARN MORE

strip out &
dilapidations

$ LEARN MORE


Testimonials

UK Support FM

Customer Reviews

Carla Jennings

Pure Offices
Ryan did an office fit-out for us at Pure Offices Morley and we couldn't be happier with his work. From the initial quotation to finished product, Ryan was helpful and professional throughout. His work is finished to a high standard and I certainly wouldn't hesitate in recommending Ryan and UK Support to anyone. Thank you for doing such a fantastic job.

Darren Bellwood

MYA Cosmetics
The work was carried out to a high standard, on time and within budget.

The process from quote to end product was a positive experience and I would certainly recommend Ryan and his business for future work.

Michelle Shakleton

Google
Highly recommend!!

Deb H

Google
A true professional, would highly recommend!

Dan Jackson

Google
Great service, I would highly recommend this company. always on time always at a very fair price for 1st class work. I only use this company now for work in our factory, as I can have complete trust in Ryan to complete the work to a very high standard.